A factory-integrated 50kW/112.53kWh all-in-one BESS cabinet using seven 51.2V/314Ah LFP battery packs in series. The system integrates air cooling and fire protection in a single IP54 enclosure. Engineered for peak shaving, solar self-consumption, backup power, TOU arbitrage, and microgrid applications. Every system is configured to site requirements — capacity, operating mode, protection design, and integration interfaces are confirmed per project.

E-Able Power GCB-E112 commercial industrial energy storage cabinet — 50kW 112.53kWh all-in-one LFP BESS

Key Specifications at a Glance

AC Power 50kW - Three-Phase 380V AC Nominal Capacity 112.53kWh
Battery Packs 7 x 51.2V / 314Ah LFP Cycle Life 6,000 cycles at 90% DOD
Architecture All-in-One BESS + BMS + EMS + Air Cooling + Integrated Fire Protection Enclosure IP54 - approx. 1200 x 803 x 2375mm - approx. 1300kg
Battery Voltage 358.4V - Range 280-403V Grid Interface Three-Phase Four-Wire AC380, 50Hz
Communication RS485 / CAN Warranty 10 Years
PROJECT-FOCUSED ENERGY STORAGE DESIGN
Integrated All-in-One Cabinet
Factory-assembled enclosure combines battery modules, PCS, BMS, EMS, air cooling and integrated fire protection — reducing on-site coordination, wiring, and commissioning time vs separate-component systems.
Grid & Backup Planning
Choose grid-tied (peak shaving, TOU, demand management), off-grid (islanded backup), or hybrid (solar-plus-storage) mode — configured to your load profile, tariff structure, and utility interconnection rules.
Engineering Before Delivery
Confirm installation space, cable routes, local codes, fire strategy, ambient conditions, and commissioning scope before order. E-Able Power provides a complete technical proposal within 2–3 business days.
REFERENCE CONFIGURATION & TECHNICAL DATA
The following figures are reference information. Final configuration, compliance documents, and installation conditions are confirmed per project. All parameters configurable to site requirements.
System Reference Specification
AC Power & Capacity 50kW / 112.53kWh nominal — AC-coupled reference configuration.
Battery Cells Grade A LFP prismatic cells — 314Ah.
Cycle Life 6,000 cycles at 90% DOD.
AC Interface 50kW rated charge/discharge power; three-phase four-wire AC380, 50Hz, rated current 76A, THD <3%, power factor -1 to 1.
Integrated Subsystems Integrated fire-protection system and air cooling (refrigeration, ventilation and heating).
Enclosure IP54 — 1200×803×2375mm — 1300kg. Verify access, foundation, and lifting before order.
Battery Configuration 7 × 51.2V / 314Ah LFP battery packs in series; rated voltage 358.4V; operating range 280–403V.
Operating Environment -20°C to 50°C; 0–95% RH; altitude <2,000m; noise ≤75dB.
System Efficiency / Communication ≥90% system efficiency; RS485 / CAN communication.
Warranty 10 Years.
HOW TO SELECT THE RIGHT C&I ENERGY STORAGE SYSTEM
Project Input Why It Matters
Load Profile & Tariff Defines power, usable energy, and expected value of peak reduction or energy shifting.
Solar & Utility Connection Determines AC coupling topology, grid connection conditions, export policy, and operating controls.
Backup Loads & Duration Separates essential from non-critical loads for a realistic resilience design.
Site & Compliance Review Confirms indoor/outdoor placement, ventilation, clearances, local approvals, and safety requirements.
PROJECT APPLICATIONS
Factories
Peak shaving, load management, and essential-process backup.
Commercial Buildings
Demand charge reduction for offices, retail, and campuses.
Solar + Storage
Maximize PV self-consumption and dispatch planning.
EV Charging Hubs
Buffer charging peaks and reduce grid upgrade costs.
FREQUENTLY ASKED QUESTIONS

Q: How should we size a commercial energy storage system?

Start with interval load data (15-minute or hourly), the tariff structure (peak/off-peak rates, demand charges), planned solar capacity, required backup loads, and desired operating objective. The GCB-E112 reference configuration (50kW/112.53kWh) suits sites with peak demand around 40–60kW and 2–4 hours of storage duration. E-Able Power validates sizing against your actual load profile and delivers a complete report within 2–3 business days.

Q: Can this system operate with solar and the grid simultaneously?

The final operating mode, protection coordination, and utility interconnection requirements must be confirmed for the actual project and local grid code. E-Able Power configures the system interface according to the approved site design.

Q: What customization options are available for the GCB-E112?

The GCB-E112 is fully configurable to project requirements. Customization options subject to project volume include: cell capacity selection (314Ah LFP), AC output power configuration, cabinet color and OEM branding (logo + housing), integration with third-party inverters and EMS platforms, communication protocol (RS485 / CAN), and destination-market compliance requirements. Contact E-Able Power with your project specification for a customized proposal.

Q: What should be verified before placing an order?

Confirm the final bill of materials, energy capacity, installation location (indoor/outdoor), environmental conditions (ambient temperature, humidity), electrical interface (AC voltage, phase, grid connection), fire-safety clearances per local code, required certificates for the destination market, delivery scope, and commissioning responsibilities. E-Able Power provides a pre-order verification checklist and remote commissioning support via video call. On-site commissioning engineer available for projects above 500 kWh.
QUALITY ASSURANCE & CERTIFICATIONS
Quality Mgmt
Environmental
EU Compliance
62619 Cells
Safe Chemistry

Factory: Dongguan, Guangdong, China. 10-year warranty. Project-specific compliance documentation available on request.

GCB-E50 50kW 50kWh commercial energy storage cabinet
GCB-E50                             50kW / 50kWh Commercial BESS
GCB-C1200 500kW 1.2MWh utility-scale energy storage container
GCB-C1200                             500kW / 1.2MWh Utility-Scale BESS
GCB-E241 125kW 241.15kWh commercial energy storage cabinet
GCB-E241                             125kW / 241.15kWh C&I BESS
FULL ESS RANGE E-Able Power
Full ESS Range                             All energy storage solutions

GCB-E112 FAQ

What is the GCB-E112's rated output or capacity?

The GCB-E112 provides 50kW three-phase 380V AC and 112.53 kWh of energy.

What battery technology does the GCB-E112 use?

It uses Grade A LFP prismatic 314Ah. It is rated for 6,000 cycles at 90% DOD.

Is the GCB-E112 protected against dust, water and impact?

Rated IP54. It is built for outdoor use.

How is the GCB-E112 managed in different conditions?

Operating range -20°C to 50°C.

What control and communication does the GCB-E112 support?

Communication via RS485 / CAN.

Can the GCB-E112 be configured for a project?

Yes — configuration can be adapted for a project. It carries a 10 years warranty. Contact us with your site and energy or lighting requirements for sizing and a quotation.

Plan your site-appropriate energy storage system

Every GCB-E112 is configured to your site — capacity, operating mode, protection design and integration interfaces are confirmed per project. Send your load profile, utility requirements, solar plan and backup target for a complete technical proposal within 2–3 business days.